RALEIGH: Duke: Cleanup at Dan River plant will take 2 years - WFLA News Channel 8

Duke: Cleanup at Dan River plant will take 2 years

Posted: Updated:
On the afternoon of Feb. 2, a stormwater pipe under the primary 27-acre coal ash pond failed. (AP Photo) On the afternoon of Feb. 2, a stormwater pipe under the primary 27-acre coal ash pond failed. (AP Photo)
RALEIGH, N.C. -

Duke Energy says it plans to move three leaky coal ash pits away from North Carolina waterways, including one that coated 70 miles of the Dan River with toxic sludge.

Duke says it will take at least two years to clean up the Dan River site, and sites near Asheville and Charlotte. State regulators say Duke's plans fall short of cleaning up nearly three dozen leaky coal ash dumps spread across the state.

After the Feb. 2 spill, Gov. Pat McCrory and regulators gave Duke a March 15 deadline to provide details of how the company would stop pollution at the ash pits.

Duke President Lynn Good sent Department of Environment and Natural Resources Secretary John Skvarla a letter with details.

But on Thursday, Skvarla called the plans inadequate.

RELATED STORIES

Copyright 2014 The Associated Press. All rights reserved.

  • Coal Ash SpillMore>>

  • Environment group says public 'mislead' to think Dan River is clean

    Environment group says public 'mislead' to think Dan River is clean

    Friday, July 18 2014 2:06 PM EDT2014-07-18 18:06:07 GMT
    Waterkeeper Alliance says photos show coal ash is still present in the Dan River. (Waterkeeper Alliance)Waterkeeper Alliance says photos show coal ash is still present in the Dan River. (Waterkeeper Alliance)
    Waterkeeper Alliance provided photos it says show deposits of coal ash still in the Dan River despite claims to the contrary.
    Waterkeeper Alliance provided photos it says show deposits of coal ash still in the Dan River despite claims to the contrary.
  • NC, Va. groups to monitor coal ash in Dan River

    NC, Va. groups to monitor coal ash in Dan River

    Friday, July 18 2014 9:59 AM EDT2014-07-18 13:59:45 GMT
    A collapsed pipe at Duke Energy's Dan River Steam Station dumped coal ash into the Dan River.A collapsed pipe at Duke Energy's Dan River Steam Station dumped coal ash into the Dan River.
    Two water protection groups will continue to monitor the Dan River to identify coal ash from a massive spill in North Carolina that flowed into Virginia.
    Two water protection groups will continue to monitor the Dan River to identify coal ash from a massive spill in North Carolina that flowed into Virginia.
  • Feds: Duke Energy has finished moving coal ash from Dan River

    Feds: Duke Energy has finished moving coal ash from Dan River

    Thursday, July 17 2014 3:03 PM EDT2014-07-17 19:03:48 GMT
    Duke has dredged up about 2,500 tons of ash and contaminated sediment, as well as another 500 tons that had accumulated in settling tanks at downstream municipal water treatment plants.
    Duke has dredged up about 2,500 tons of ash and contaminated sediment, as well as another 500 tons that had accumulated in settling tanks at downstream municipal water treatment plants.
Powered by WorldNow

200 South Parker Street, Tampa, FL 33606

Telephone: 813.228.8888
Fax: 813.225.2770
Email: news@wfla.com

Can’t find something?
Powered by WorldNow
All content © Copyright 2000 - 2014 Media General Communications Holdings, LLC. A Media General Company.